This scheme was a refurbishment of an existing trading store. Existing customer offers were rejuvenated throughout the store alongside the entirety of the stores...
This scheme was an all-encompassing refurbishment of an existing trading store. Existing customer offers were rejuvenated throughout the store alongside the entirety of the...
Woodgreen have recently completed the refurbishment of a David Lloyd Leisure Centre. New exercise studios were created and the existing gymnasium refurbished. Alongside alterations...
This scheme was a fast track, all-encompassing refurbishment of a 60,000ft trading store. Existing customer offers were rejuvenated throughout the store alongside the entirety...
During the summer, Woodgreen were tasked with the installation of 14 dock levellers in an existing distribution centre within a challenging 6 week programme. Necessary steel...
Throughout the past year, Woodgreen has delivered upwards of 20 eCommerce based schemes in all corners of the UK , with the nature and...
This scheme comprised of the refurbishment works associated with the Male & Female wash rooms at ground and first floors along with associated works...
Woodgreen undertook the construction of Unit 10A to form a new restaurant shell, before the building works were able to commence the existing management...
Woodgreen undertook this complete refurbishment of an existing store and associated areas alongside the formation of a new ‘Vets 4 Pets’ area within the...
A varied and comprehensive scope was carried out at this supermarket with challenging restrictions in place that required a diligent approach to the scheme....
Woodgreen was appointed to carry out the construction of PPA and Audiology rooms to a newly constructed mezzanine area and staircase. Demolitions and alterations...
Woodgreen has recently completed an extensive refurbishment of the Asda at Colne. Unlike other retail projects undertaken, this scheme involved purely the construction of...
Woodgreen undertook this project on a full design and build based on an initial concept by the client, appointing both the architect and structural...
In 2014, Woodgreen was approached to convert an existing dilapidated building into modernised supported and managed housing. The works involved a complete strip out,...
The remodel at Wolverhampton involved the refurbishment and re-laying of the store. The existing revolving entrance doors were removed and replaced with a draught...
Woodgreen were recently appointed to carry out the fast track construction of a new pets at home and grooming salon in Consett The scheme...
In January 2014 we were appointed to form a new office space. This involved demolishing an existing parts store, reclaiming the space and forming...
This was a full store remodel comprising refrigeration swap out, full fixtures replacement, M&E installation, decoration and terrazzo works, all in the trading store....
This is the refurbishment of an existing 35,000 square foot industrial unit to form new warehouse space, including racking fit out, showroom and office...
This project included the strip out and rebuild of a large section of the existing building. Internally we were challenged with increasing the ground...
In 2012 Woodgreen was asked to carry out a remodel at Asda’s Shrewsbury superstore. This store differs from many supermarkets with traditional features such...
A full refurbishment was carried out in this 80,000ft trading store and was carefully phased to reduce disruption to both the store and customers....
We were approached by Leonard Developments to clear the Kaye Street site and build two blocks of luxury high-end apartments, one of six homes...
This scheme comprised of a full strip out of an existing boathouse, situated on the Acombe water treatment site. This was followed by the...
In 2012 we were approached by TC Harrison to fit out of a recently purchased commercial unit in Birstall. The installation involved the creation...
In 2012 we were asked to tender for a project to create a glazed walkway at the Huddersfield Crematorium. Working closely with Kingfisher glazing...
In 2012 we were approached to tender for construction work at Pinderfields Hospital, and we jumped at the chance. We successfully won the contract...
We carried out construction works to form a new pumping station and switchgear plant room at a water treatment site in Sheffield.
We were approached by the committee of Gearstones to carry out works on their toilet and shower areas, we had to design in and...
This scheme involved the partial demolition of two existing commercial units and an extension to form three new modern retail units, new façade and...
This was the fit out of the 35,000 square foot industrial unit. The works involved a full fit out of the new showroom, including...