T.C Harrison, Transit Showroom
Location: Peterborough
Type of Work: New Build & Fit Out
Value: £340k
Programme: 11 Weeks

Woodgreen undertook this project on a full design and build based on an initial concept by the client, appointing both the architect and structural engineer to develop the scheme to fruition. The works included an extension to the existing building comprising of a structural steel frame, wall and roof cladding including a structural deck, aluminium curtain walling along with glazed vehicle doors. The fit out comprised the installation of comfort cooling and Ford approved lighting with extensive ceramic floor tiling and interior decorations throughout. External works included the re-grading and re-laying the existing block paving and the installation of stainless steel bollards.

ASDA Shipley - Projects - Woodgreen Construction Ltd
DL for WG 190416 (6)
Woodgreen Transit Showroom 180315 (18)
Canterbury Childrens Centre - Woodgreen Construction Ltd
Bagno Fit Out - Projects - Woodgreen Construction
Gearstones Lodge Outdoor Centre - Projects - Woodgreen Construction Ltd
IMG_2377
ASDA_GREAT_BRIDGE_PC_002
TCH Harrison JCB - Woodgreen Construction Ltd
Db2c6nt8_tEmeGwYfrUhIcqqW5NcKCmd0dOkTtjjrl4,CucMc_01vhbLkZ-hKzKVAYYzyorzW_lhEde71WePnHM
ASDA Wolverhampton - Projects - Woodgreen Construction Ltd
IMG_4514
Huddersfield Crematorium - Projects - Woodgreen Construction Ltd
ETM - Projects - Woodgreen Construction Ltd
_ATT6280
Asda Shewsbury - Projects - Woodgreen Construction Ltd
DSC_0485
Picture1
Blackburn Meadows, Sheffield - Projects - Woodgreen Construction Ltd
Bagno Refurbishment - Projects - Woodgreen Construction Ltd
Sinfin - Woodgreen Construction Ltd
Pinderfield Hospital - Projects - Woodgreen Construction
TC Harrison JCB Dealership - Woodgreen Construction Ltd
SAMSUNG CAMERA PICTURES
Woodgreen Construction Ltd

Enquiry

Twitter

    • We are proud to announce that we were awarded Key Contractor Framework Health and Safety Award by the Sainsbury's A… https://t.co/3QVgJzz12X
    • Work on site continues at the new retail unit in Suffolk #WGC http://t.co/jQgdvB5JuL
    • Woodgreen have achieved an annual recycle rate of 98%, after recycling 1069.02 tonnes of waste from site #WGC
    • Woodgreen completes new Vets 4 Pets at Harrogate store @Vets4PetsGroup @PetsatHome http://t.co/BTfTEbh2jl
    • Woodgreen's Home Made Apple Pie #greatbritishbakeoff - Well done Jonny! http://t.co/hNVALRa61N

Testimonials

Peter Archer, Asda Scheme Development Manager

‘I am extremely appreciative of all the hard work and tenacity shown by all concerned in delivering such a fantastic change to the store.’

John Dixon, ETM

‘The works were carried out from start to finish in a well managed, organised fashion.’

Peter Forster from TC Harrison Group ltd

‘It was a pleasure to work with Woodgreen, and the whole team pulled together  to land a great project’

Simi Chaudhry, General Store Manager, Asda Great Bridge

‘Thank you for choosing to give our customers the lovely new concept store that we have and the chance to influence the future of the company’s renewal programme.’
Woodgreen Construction Ltd
Contact
  • Woodgreen Construction Ltd - Twitter
Find, Share, Follow