We were approached by the committee of Gearstones to carry out works on their toilet and shower areas, we had to design in and extra toilet as well as keeping their existing capacity, in such small rooms this was a challenge and considering the age of the building we came across varying obstacles which we had to overcome before and during our site installation. We carried out the full refurbishment from design to completion in 2 weeks while the centre was closed, for a very satisfied client.