15.3.2019
Woodgreen completes another project for Argos at the Tottenham Hale Store. This scheme was a fast track, all-encompassing re-fit (stock checker) of an existing trading store to current model specifications. Existing customer offers were rejuvenated in the store alongside the entirety of the stores signage, wall...,
Read More...
15.3.2019
Woodgreen completes another project for Argos at the Orpington Springvale Store. This scheme was a fast track, all-encompassing re-fit (stock checker) of an existing trading store to current model specifications. Existing customer offers were rejuvenated in the store alongside the entirety of the stores signage,...,
Read More...
12.2.2019
Woodgreen completes its first project for First at the James Street Depot, York. This scheme was to carry out entrance modification works which included the installation of new vehicle gates to the external boundary, installation of vehicle barriers, fencing and a pedestrian gate, resurfacing...,
Read More...
15.1.2019
Woodgreen completes another project for Asda at the Huyton Store. This scheme was a fast track, all-encompassing back of house project to totally relocate the home shopping pod and install a recessed loading dock within a live trading internal warehouse area. The works comprised...,
Read More...
14.1.2019
Woodgreen completes another project for Sainsbury’s Argos at the Store in Throckley, Newcastle. This scheme was a fast track, all-encompassing introduction of a new Argos store within an existing trading store. Existing fixtures are reconfigured to the new proposed layout, which then led to...,
Read More...
14.1.2019
Woodgreen completes another project for Sainsbury’s at the Arndale Centre, Manchester. This scheme was a fast track, all-encompassing refurbishment of the office facilities on the 19th floor. The works comprised M&E installations, new kitchenette, flooring, decorations, branding including feature walls and new furniture. The...,
Read More...
20.11.2018
Woodgreen completes another project for Asda at the Sunderland Store. This scheme was a fast track, all-encompassing re-fresh of an existing trading store. Existing customer offers were rejuvenated in the store alongside the entirety of the stores signage, fixtures and external works which incorporated...,
Read More...
18.10.2018
Woodgreen completes its first project for Morrisons at the Clifton Store in Nottingham. This scheme was a fast track, all-encompassing re-fresh of an existing trading store. Existing customer offers were rejuvenated in the store alongside the entirety of the stores signage, fixtures and chilled/frozen...,
Read More...
18.10.2018
Woodgreen completes another project for Sainsbury’s Argos at the Store in Fallowfield, Manchester. This scheme was a fast track, all-encompassing introduction of a new Argos store within an existing trading store. Existing fixtures are reconfigured to the new proposed layout, which then led to...,
Read More...
18.10.2018
Woodgreen completes another project for Asda at the Grimsby Store. This scheme was a fast track, all-encompassing re-fresh of an existing trading store. Existing customer offers were rejuvenated in the store alongside the entirety of the stores signage, fixtures and chilled/frozen cases. The restrictive...,
Read More...